ELEMENT 2.1 HAZARD IDENTIFICATION AND ANALYSIS.

Performance Objective. The organization will develop and maintain a process that ensures that hazards in operations are identified. Hazards will be identified from the analysis of critical design and performance factors, processes, and activities in sufficient detail to determine associated level of risk and risk acceptability.
Design Expectations. The organization will implement processes to accomplish the objectives and expectations for Processes 2.1.1 System description and task analysis and  process  2.1.2. Identify hazard 

PROCESS 2.1.1 SYSTEM DESCRIPTION AND TASK ANALYSIS.

Performance Objective. The organization will analyze its systems, operations, and operational environment to gain an understanding of critical design and performance factors,processes, and activities to identify hazards.
Design Expectations. System descriptions and task analysis will be developed to the level of detail necessary to:
        (a) Identify hazards,
        (b) Develop operational procedures, and
        (c) Develop and implement risk controls.

Process 2.1.2 Identify Hazard

While it is recognized that identification of every conceivable hazard is impractical, organizations are expected to exercise due diligence in identifying and controlling significant and reasonably foreseeable hazards related to their operations.

 Risk likelihood and severity may be expressed in quantitative or qualitative terms.

                       Design Expectations.
(1) Hazards will be:
      (a) Identified for the entire scope of the system, as defined in the system description
      (b) Documented.

(2) Hazard information will be:
      (a) Tracked, and
      (b) Managed throughout the entire SRM process.



Comments

Popular posts from this blog

SHEL(L) Model

National Aerospace Standard (NAS) 411

Safety Culture